Skip to content
SolarRates.pk

Solar Installers in Rawalpindi

Solar installation companies serving Rawalpindi (Punjab). Net metering here is handled by IESCO.

We found these businesses on public Google Maps listings. We haven't reviewed or verified them, nobody paid to be here, and the order simply follows the number of Google reviews. Before you sign, compare two or three itemised quotes, read recent reviews and ask whether the installer can handle your IESCO net metering file.

MSS Solar

PD 452/B, Ground Floor, Al-Kareem Plaza, I.J.P Road, Chungi, near Pindora, Rawalpindi

3.5 ★ on Google · 24 reviews

Unclaimed listing, details from Google Maps as of 2 October 2026. Is this your business? Claim it

Haseeb Solar System

Shop B3, Basement, Al Rahman Plaza, D.A.V. College Rd, Naya Mohalla, Rawalpindi

4.6 ★ on Google · 21 reviews

Unclaimed listing, details from Google Maps as of 2 October 2026. Is this your business? Claim it

ETC Solar

Office 1, 1st Floor, Ayesha Clinic Building, KRL Rd, Jamshed Colony, Rawalpindi

4.7 ★ on Google · 19 reviews

Unclaimed listing, details from Google Maps as of 2 October 2026. Is this your business? Claim it

Frequently asked questions

How much does solar installation cost in Rawalpindi?

Our estimate for a typical 5 kW system is Rs 399,208 – Rs 589,349, without batteries, based on today's panel and inverter listings plus installation. Quotes in Rawalpindi vary with structure height, roof type and brands, so get 2–3 itemised quotes.

Solar quotation checklist →

How do I choose a reliable installer in Rawalpindi?

Ask whether the company is certified with AEDB, insist on an itemised written quote with brands and models, ask who handles warranty claims, and talk to one or two of their past customers. Be careful with very low prices and vague 'lump sum' lines.

What should a proper installation include?

Separate earthing for the panel frames and the inverter, surge protection (SPD) and breakers on both the DC (panel) and AC sides, correctly sized copper cables, a firm structure that doesn't damage the roof, and an inverter placed somewhere shaded and ventilated.

How long does net metering take with IESCO?

Timelines vary. Your installer usually prepares the application and documents for IESCO, which then issues a demand notice and installs a bidirectional (green) meter. New connections are now on NEPRA's net billing terms, where exports earn Rs 8.13 a unit.

Net metering vs net billing, explained →

Can I pay for solar in installments?

Some banks finance home solar systems through their own panels of approved installers, with a down payment and monthly instalments. Ask the installer whether they are on a bank's approved list before you apply.

Solar on installments: bank options →